Blog
Field notes: the corridor that worked on the map and dead-ended at a four-lane highwayA least-cost path connected two habitat blocks beautifully on screen, then met a highway with no crossing structure. Notes on where desktop screening ends.
What is a watershed approach under the 2008 compensatory mitigation ruleWhat the watershed approach under the 2008 Compensatory Mitigation Rule requires, how service area ties in, and what USACE districts look for.
What is a focal species, and why it decides your corridor widthA focal species sets the patch size and gap distance rules for a corridor design. Here's how to pick one before you've commissioned a survey.
What a pinch point in a wildlife corridor means for your mitigation designWhat a corridor pinch point is, why it narrows your offset design options, and how to flag one before you've committed to a site boundary.
Field notes: the corridor that looked connected until the creek dried upField notes on a riparian corridor that classified clean on one flyover date and turned out to be dry most of the year.
What is a reference wetland, and why mitigation site design starts thereA reference wetland sets the performance standards your mitigation design has to hit. Here's how it fits into site selection and corridor design.
Effective mesh size vs. edge density: the fragmentation metric regulators actually ask forEffective mesh size and edge density measure different things. Here's which one agency reviewers actually want, and when you need both.
What is an interagency review team (IRT) in mitigation banking?What an Interagency Review Team is, who sits on it, and how it moves a mitigation bank from prospectus to signed instrument.
The parcel that scored high on paper and failed on the groundA field note on a high-scoring parcel that fell apart on inspection, and what remote screening can and can't tell a mitigation planner.
In-lieu fee vs. permittee-responsible mitigation: how site requirements differHow in-lieu fee programs and permittee-responsible mitigation differ in who picks the offset site and what agencies check for.
Conservation easement vs. mitigation bank credit: what's the differenceConservation easements and mitigation bank credits get confused constantly. Here's what each one actually does and how PRM and in-lieu fee fit in.
What is a stepping stone habitat in corridor design?A plain explainer on stepping stone habitats, corridor pinch points, and how least-cost path analysis finds the patches that make them work.
REA vs HEA: what's actually different in mitigation accountingHEA scales restoration to habitat acres; REA is the broader equivalency framework. How NRDA trustees use each, and why site inputs matter first.
What is functional lift in wetland and stream mitigation?Functional lift scores the ecological function a mitigation action adds, separate from acreage. Here's how it's screened before a field survey.
How to calculate edge density for a habitat patch by handA step-by-step method for calculating edge density and edge-to-area ratio for a single habitat patch using perimeter and area measurements.
Least-cost path analysis for wildlife corridors, explainedHow least-cost path analysis works, what a resistance surface is, and where it fits (or doesn't) in early offset site screening.
Mitigation bank credit ratios explainedHow mitigation bank credit ratios get set, why compensatory mitigation ratios shift by site, and what a credit release schedule controls.
Patch size vs. core area: what shows up in a regulator's reviewPatch size and core habitat area aren't the same number. Here's how reviewers actually calculate interior habitat and weigh edge effects.